INTERCULTURAL DESIGN - PROJECT 2
14/01/19 - 25/01/19 (Week 2 - Week 3)
Alicia Lee Hui Min (0331719)
Intercultural Design
Project 2 - Field Study
INSTRUCTIONS
Week 3 (21/01/19 - 26/01/19)
After the proposal was completed, it's time to pack our bags and head to Korea! During our 6 days there, we got to visit various different places which gave us a chance to explore and collect the necessary data needed.
Here is a summary of the places we went in Korea.
As for data collection, my topic is regarding colours, motifs, bojagi and hanbok. Before heading to Korea, my group members and I agreed to walk separately, that way we can collect various different data and shared them among each other once we're back but with the exception of visiting certain places together like the hanbok museum and textile museum.
Throughout my visit in Korea, I was able to collect various data however they were in the form of photos and some physical copies like brochures and souvenirs.
Here's an overview of some of the photographs taken and the physical collectives.
Week 4 (27/01/19 - 31/01/19)
Once we were back from Korea, my group set a time to meet up and share the data we collected among ourselves. We also started to work on our slides to present our findings during our trip. While discussing, we had similar and also different data collected.
Week 4 (01/02/19)
It's presentation day, here are the slides prepared by my group.
Feedback : Mr Charles told us to not think of our idea as just packaging but packaging , something deeper but he said our data collected was good.















Comments
Post a Comment